Planned preventive maintenance (PPM) is where FM providers win or lose trust. When a statutory check is missed, the client carries the legal risk and the provider carries the blame. Yet many PPM schedules still live in spreadsheets, with paper job sheets coming back days later.
This guide covers how to run PPM and statutory compliance from one system, with the evidence captured on site.
A spreadsheet can list what is due. It cannot tell you whether it was done, by whom, to what standard, or where the certificate is. The gaps show up at the worst time: during an audit, after an incident, or when a contract changes hands and the history cannot be found.
SFG20 is the UK industry standard for building maintenance specifications. It sets out what should be done to each type of asset and how often, and flags which tasks are statutory. Building your PPM schedule on SFG20, or on the client's own specification, gives you a defensible answer to the question "why do we check this, and this often?"
Every building is different, but these come up on most contracts:
| Area | Main requirement | Guidance |
|---|---|---|
| Fire safety | Fire risk assessment and maintenance of fire safety equipment, under the Regulatory Reform (Fire Safety) Order 2005 | GOV.UK |
| Legionella | Assess and control the risk from water systems | HSE |
| Lifting equipment | Thorough examination by a competent person, under LOLER 1998 | HSE |
| Gas | Gas appliances and pipework kept safe and maintained by registered engineers | HSE |
| Electrical | Electrical systems maintained to prevent danger, under the Electricity at Work Regulations 1989 | HSE |
The software does not make a building compliant. What it does is make sure every check is scheduled, done, evidenced and easy to find.
A mobile work order should carry everything the engineer needs and capture everything the client needs:
When the engineer closes the job, the record and its evidence are filed against the asset straight away. No paper job sheet waits in a van for a week.
PPM and reactive jobs compete for the same engineers. Seeing both in one plan lets planners fit urgent work in without silently dropping statutory visits. Overdue statutory tasks should be impossible to miss.
Many buildings already have sensors for temperature, humidity, leaks or energy. Connecting them to the job system means a reading that passes a set threshold creates a job automatically, before the occupant notices. Water temperature monitoring is an example where this supports legionella control.
Reslink holds your assets and their schedules, sends planned and reactive work orders to engineers' phones, and captures readings, photos and signatures on site. Planners and managers see planned and reactive work in one view. Reslink also connects to sensors you already have, so a reading that passes a threshold can raise a job automatically.
Planned preventive maintenance: scheduled inspections and servicing that keep assets working and buildings compliant, rather than waiting for something to break.
The UK industry standard for building maintenance specifications. It sets out the tasks and frequencies for each type of asset and shows which tasks are statutory.
Yes. Reslink connects to sensors you already have, so a reading that passes a set threshold creates a job without anyone having to report it.
Related guides: Running a mobile FM workforce on one platform and Hands-free field reporting with speech-to-form AI.
See asset management for more, or book a demo.